Thursday, March 29, 2012

Spring Updates

With spring in full swing the maintenance staff is busy recovering from aerification and working to provide superb course conditions.  A practice that we started last year to help improve our bunker consistency was to roto-till all bunkers.  Now that the winter storm systems have subsided we will once again go through all bunkers to “bust up” the sand and provide the most consistent hazard possible.  This is a practice that we will complete twice a year before and after the winter rains.
Here is a picture of the process that will take place in the next few weeks

 
The putting green opened the first week in April and is off to a great start.  I want to remind everyone that this surface is only 6 weeks old and it will take time to mature and produce results that we are looking for.  We have started to slowly lower the mowing heights and I would anticipate that by the middle of May we will be consistent with the rest of our putting surfaces.  Remember that there are two types of bent cultivars on the putting green, see if you can differentiate the two.

 Throughout this winter we have been busy building some new T surfaces.  The tees where built from our Master T- Plan developed by course architect, John Harbottle.  John’s plans show the proposed placement and shape of the new tees.  We started implementing John’s plan this past winter with the construction of three new ladies T’s.  If you have not noticed them by now, they are located on # three (2) tree, # sixteen (1) tree and # seventeen (1) tree.  Having a reputation as one of Nor Cal’s most challenging ladies course the construction of some new tees is going to help level the playing field for our Lady golfers.  Budget permitting throughout the near future we will continue to implement sections of the Master T Plan.  If anyone would like to view the entire Master Plan please feel free to swing by and I would love to go over them with you. 

Getting ready for Sod!


Wednesday, February 15, 2012

Putting Green Conversion

On January 30th we started the process of rebuilding the putting green .  This process involved coring out 7" of the existing sand profile, installing a new sand mix out 90% USGA spec sand with 10% Canadian peat moss.  Once the growing medium was installed the final step was to sod the surface with our two types of bent cultivars.  Below is a list of steps with a little more detail and some pictures to give you and idea of what was involved in the whole process.

The first step in the entire process was to use a transit( laser level) to shoot 95 points on the green so that we could keep the original integrity of the green.  After removal of the Poa contaminated surface and existing sand profile we would shoot the 95 points again to fill back to the original contours.  When we shot each point the second time, a grape stake would be installed with a black marking to indicate where the new sand should be filled.  When filling the core with our new sand, these points would ensure the new surface matched the original contours.
This photo shows the the finished product of removing the sod and 7" of existing sand mix.  It was important for us to remove 7" of sand so that we could replicate what type of sand mix that we want to move forward with in the future when the time comes to rebuild all of our current putting surfaces.

Completion of removal and all 95 grape stakes shot and marked.  Ready for new mix.
Once we completed the removal and shooting of all points we were ready to bring in our new sand mix.    We used our Dakota topdressing to help with the install of sand.  While installing the new sand mix it was important to run our vibratory plate along with some water to ensure that we would not have any settling.  We wanted a nice compacted sand ready for sod install.

Bringing in the new mix.
Installing new sand mix composed of 90% USGA spec sand sand and 10% Canadian peat moss.  This peat is added to help with water holding capacity of the profile.
Half way home
Doing the final compacting and watering before sod install.
 Once we had the new sand installed and compacted we were ready for sod install.  Before the sod was installed we needed to add a few necessary amendments to the soil and some final fine grading.
Applying the amendments and final hand raking. Ready for sod.
The final step in the whole process was to install the sod.  We had West Coast Turf install our bent this morning (2/15).  Really pleased with the quality of our new bent grass and look forward to our members reaction.  Would anticipate opening the first week in April and possibly earlier with some cooperation with Mother Nature.  Below are some pictures from the sod install.
Big rolls of bent.
Installing the bent
Finishing it off!
Complete.
Moving forward we will be waiting approximately 4-5 days until we can start to do some light rolling with our hand mowers.  Light application of sand topdressing will be made to help with the healing process.  We will also be foliar feeding the turf to supply the plant with necessary amounts of N-P-K to help with the establishment.  We will keep everyone posted with the progression and an opening date.

Tuesday, January 3, 2012

Putting Green Conversion


Putting Green Conversion

As stated in recent newsletters and on the bulletin board outside the pro-shop we will be converting the putting green from Poa Annua to a pure stand of Bent grass this February.  Listed below is a detailed description of what will take place and the timing of the whole process.  Keep in mind that we always need to consider Mother Nature this time of year.  These dates could be subject to change if we experience major extremes in weather.
January 30th
We will begin to strip the existing surface off of the green along with removing the 4-6” of underlying sand.  Along with removing the putting green surface and sand we will also remove the collar and areas of Poa contamination surrounding the putting green.  Removing these areas will ensure that we are doing everything possible to keep the Poa from encroaching into the new bentgrass.  I would anticipate this taking roughly one week.
February 6th
Using a transit we will grid the entire layout of the green to ensure that we keep the original shape and structure intact. We will then begin to add the necessary sand to compensate for the material that we removed the week prior.  This process will also include adding all the micro and macro soil amendments to ensure that we are creating a well-balanced growing medium.  We will finalize this step by floating the entire surface and re-shooting with the transit to ensure grade.
February 13th
We will begin to install the sod at this point which should take a maximum of 2 days to complete.   In order to help with the healing process we will be making continuous topdressing applications along with supplying the sod with proper foliar applications of N-P-K.  We will need to allow sufficient time for the sod to knit and become acclimated to its new subsurface before we can open it for practice.


I would anticipate the putting green needing at least six weeks to heal once sodded before we are ready for traffic.  This would have the putting green back for use sometime around the first week of April.  Thank you for your support during this process.  If you have any additional questions or concerns please feel free to contact Andrew Morgan

Wednesday, December 7, 2011

New Spray Rig

Here are a few pictures of our new spray rig that will ensure that we are making the best spray applications possible.  Pretty important when you consider that we make roughly 80-100 spray applications on an annual basis on our greens alone.



Time to turn in the 1985 Hahn.  It only made it 25years.  We can only hope that the new one makes it that long!

Monday, November 14, 2011

Bunker Construction Process #2 Greenside

Wanted to post a bunch of pictures that correspond with the rebuilding of a bunker and the importance of having a bunker to function the proper way.  By rebuilding the bunkers we will provide the most consistent hazard to play from throughout the entire course along with drastically improving the overall appearance.


Before photos of the bunkers.  You will notice that the design contours on all of our bunkers are very simple.  Basically they are just plain contours with no movement at all.  You can notice the red paint that is the basic outline of the new shape that will provide much more movement and be much more appealing to the eye.       


Starting to remove the sand.
Removing the sand 
I really love this photo because over the years I always have members coming to me and say that the bunkers need more sand.  You can see in this photo that the we had well over 2' of sand.  USGA recommendations are 4" in the bottom and 2" on the faces.  Major reason we need to have the bunkers reconstructed here.  It is almost impossible to maintain bunkers like this.  Basically what happens over the years is that because there is no bunker floor the sand is constantly getting contaminated with the underlying soil.  This contamination does not allow the sand to drain properly and you end up with compacted sand and what to we do when it gets compacted? "Add more Sand"  You will see in later photos the importance of installing a bunker floor so that we don't loose the integrity of the bunker along with not allowing for contamination. 
You can see here that we are starting to re-shape the contours and add soil where needed to form and bunker floor that is consistent.
Re-Shaping and adding soil
Re-Shaping and adding soil
Once the bunker has been reshaped to design the next step is to make sure that the bunker has proper drainage. A place for the water to go.  You can see here where the drain pipe will be installed.  Notice that we have not yet installed the "Sta Lock" material yet in the floor.
Making sure that we have proper drainage.
Here you can see us putting the finishing touches on the "Sta Lock" our bunker floor.  Notice the color difference from the above picture.  What this floor does is it creates a permanent layer between the sand and soil.  It does not allow the sand to become contaminated with the underlying soil.  So when we receive rain the water will move through our "clean" sand hit the bunker floor (Sta Lock) and exit through our proper drainage.  This is the proper way a bunker should function.
Getting ready to install Sta-Lock
Before we add the sand we want to make sure that we have proper irrigation around the bunker edges so that they do not burn out during the hot summer months.  We achieve this by installing a subsurface drip system around the bunker edges.
Installing the pebble beach white.  We are looking for 4" of sand on the bottom and 2" of sand on faces.
Finished product.  With our bunkers rebuilt and the installation of the sta-lock we will never loose the structure of the bunker.  I would estimate that we would have to replace the sand every 10 years and having a bunker floor will make this process pretty simple.  The following process should be completed on all of our bunkers for playability and visual purposes.