Starting to remove the sand. |
Removing the sand |
You can see here that we are starting to re-shape the contours and add soil where needed to form and bunker floor that is consistent. |
Re-Shaping and adding soil |
Re-Shaping and adding soil |
Making sure that we have proper drainage. |
Getting ready to install Sta-Lock |
Installing the pebble beach white. We are looking for 4" of sand on the bottom and 2" of sand on faces. |